Case Study

Hemstead Resource Recovery Facility

Client:

The Washington Group

Description:

The redevelopment of the facility was dependent on the efficient sitting of a new processing building and equipment for planning and design. Maximizing the output/efficiency for electric generating capacity is vital to meet growing building consumption. The establishment of a high accuracy control network permitted horizontal and vertical documentation of man-made structures.