Case Study

Beverly High School GreEnergy Park Wind Turbine Generator

Client:

City of Beverly

Description:

Six months of wind data was collected to prepare a Feasibility Study for the development of a commercial scale Wind Turbine at GreEnergy Park. A Grant Application was prepared on behalf of the City of Beverly to secure funding in the amount of $36,495.00 from the Massachusetts Technology Collaborative (MTC) to evaluate the design and installation of a Wind Turbine that will, along with the existing Solar Arrays, power the newly reconstructed Beverly High School.