Hilldale Solar Development Project

 

Meridian provided land surveying, site civil design, and environmental services for a 3 MW ground-mounted solar photo-voltaic system for BlueWave Solar. Meridian provided environmental and civil services to prepare drawings as part of the permitting process with the City of Haverhill. After the solar array was completed, Meridian flew the site using UAV LiDAR  to map the newly constructed solar array and site features to produce an as-built plan of the site for the client. The total field data acquisition time for this 40+ acre site consisted of two 15 minute flights at an altitude of 50 meters.